Compare & price
HomeData centersMexicoQueretaro

Data centers in Queretaro

Queretaro has 7 data centers listed on DataColoc, operated notably by ATC HOLDING FIBRA MEXICO, EdgeUno, Inc., Ascenty DataCenters e Telecom. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Queretaro (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 7 data centers offering colocation in Queretaro, including ATC HOLDING FIBRA MEXICO, EdgeUno, Inc., Ascenty DataCenters e Telecom. Its top-connected site lists 13 networks.

Frequently asked questions

How much does a rack (colocation) cost in Queretaro?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 7 data centers in Queretaro to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Queretaro are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Queretaro really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Queretaro, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,071
Cost per kW per month€152 – €191
Over 3 years (36 months)€31,068 – €38,556

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Queretaro →

RedIT Queretaro

ATC HOLDING FIBRA MEXICO · 76090
on quote

EdgeUno Datacenter Mexico (QRO2)

EdgeUno, Inc. · 76158
2 networks present
on quote

EdgeUno Datacenter Queretaro Mexico (QRO1)

EdgeUno, Inc. · 76246
7 networks present
on quote

Ascenty QRO01 - Querétaro

Ascenty DataCenters e Telecom · 76295
13 networks present
on quote

Ascenty QRO02 - Querétaro

Ascenty DataCenters e Telecom · 76270
10 networks present
on quote

EdgeUno Datacenter Queretaro Mexico (QRO2)

EdgeUno, Inc. · 00000
1 networks present
on quote

EdgeUno Datacenter Queretaro Mexico (QRO3)

EdgeUno, Inc. · 76246
1 networks present
on quote

What Queretaro allows

Queretaro has 7 data centers, operated by ATC HOLDING FIBRA MEXICO, EdgeUno, Inc., Ascenty DataCenters e Telecom.

Connectivity from Queretaro

13 networks are listed at the sites in Queretaro according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Queretaro

A city has no electricity of its own: the sites in Queretaro are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.6% of its electricity from natural gas (2025). The detail: natural gas 61.6%, oil (fuel oil, diesel) 9.4%, hydro 8.1%, solar 7.4%, wind 6%, coal 3%. Fossil fuels (coal, gas, oil) account for 74% of it. A kilowatt-hour there weighs 474 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Queretaro

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of Queretaro, and 5 within 200 km. The strongest: magnitude 5.3 in 1979, 69 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Queretaro does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Queretaro

The nearest site outside Queretaro is 7 km away, in Santiago de Querétaro. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Mexico

Advertisement