Compare & price
Home › Data centers › Mexico › San Mateo Atenco

Server colocation & hosting in San Mateo Atenco

San Mateo Atenco has 1 data center listed on DataColoc, operated notably by ATC HOLDING FIBRA MEXICO. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in San Mateo Atenco (server housing) relies on one listed data center, operated by ATC HOLDING FIBRA MEXICO. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in San Mateo Atenco?

DataColoc lists 1 data center offering colocation in San Mateo Atenco (ATC HOLDING FIBRA MEXICO). The nearest alternatives are listed below, with their distance.

What connectivity is available in San Mateo Atenco?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in San Mateo Atenco?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in San Mateo Atenco →

ATC Edge TOL/E1

ATC HOLDING FIBRA MEXICO · 52106
on quote

What San Mateo Atenco allows

The data center listed in San Mateo Atenco is operated by ATC HOLDING FIBRA MEXICO.

The electricity behind San Mateo Atenco

A city has no electricity of its own: the sites in San Mateo Atenco are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.6% of its electricity from natural gas (2025). The detail: natural gas 61.6%, oil (fuel oil, diesel) 9.4%, hydro 8.1%, solar 7.4%, wind 6%, coal 3%. Fossil fuels (coal, gas, oil) account for 74% of it. A kilowatt-hour there weighs 474 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under San Mateo Atenco

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of San Mateo Atenco, and 45 within 200 km. The strongest: magnitude 7.1 in 2017, 140 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What San Mateo Atenco does not allow

With a single listed site, San Mateo Atenco cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near San Mateo Atenco

The nearest site outside San Mateo Atenco is 12 km away, in Toluca. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Mexico