Compare & price
HomeData centersMexicoEl Marques

Data centers in El Marques

El Marques has 4 data centers listed on DataColoc, operated notably by KIO, Equinix, Inc., Bleeding Edge. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in El Marques (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in El Marques, including KIO, Equinix, Inc., Bleeding Edge.

Frequently asked questions

How much does a rack (colocation) cost in El Marques?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in El Marques to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in El Marques are ISO 27001 certified?

1 of the 4 data centers listed in El Marques declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in El Marques really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in El Marques, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,046 – €1,254
Cost per kW per month€186 – €225
Over 3 years (36 months)€37,656 – €45,144

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in El Marques →

KIO Querétaro 1 (QRO1)

KIO · 76246
67 networks present
on quote

Equinix MX1/MX2 - Mexico City

Equinix, Inc. · 76246
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS33 networks present
on quote

Bleeding Edge QRO1

Bleeding Edge · 76246
1 networks present
on quote

KIO Querétaro 2 (QRO2)

KIO · 76246
5 networks present
on quote

What El Marques allows

El Marques has 4 data centers, operated by KIO, Equinix, Inc., Bleeding Edge. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from El Marques

67 networks are listed at the sites in El Marques according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 4 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Google, Microsoft Azure, Oracle Cloud, Meta, Akamai, Cloudflare, Fastly: they are present at the exchange points where 2 of the 4 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind El Marques

A city has no electricity of its own: the sites in El Marques are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.6% of its electricity from natural gas (2025). The detail: natural gas 61.6%, oil (fuel oil, diesel) 9.4%, hydro 8.1%, solar 7.4%, wind 6%, coal 3%. Fossil fuels (coal, gas, oil) account for 74% of it. A kilowatt-hour there weighs 474 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under El Marques

Since 1970, 2 earthquakes of magnitude 5 or above have been recorded within 100 km of El Marques, and 5 within 200 km. The strongest: magnitude 5.3 in 1979, 64 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What El Marques does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near El Marques

The nearest site outside El Marques is 9 km away, in Queretaro (7 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Mexico

Advertisement