Compare & price
Home › Data centers › Mexico › Apodaca

Server colocation & hosting in Apodaca

Apodaca has 3 data centers listed on DataColoc, operated notably by Equinix, Inc., Triara Mty. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Apodaca (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Apodaca, including Equinix, Inc., Triara Mty. Its top-connected site lists 10 networks.

Frequently asked questions

How much does a rack (colocation) cost in Apodaca?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Apodaca to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Apodaca are ISO 27001 certified?

1 of the 3 data centers listed in Apodaca declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Apodaca really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Apodaca, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,104 – €1,312
Cost per kW per month€197 – €235
Over 3 years (36 months)€39,744 – €47,232

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Apodaca →

Equinix MO1 - Monterrey

Equinix, Inc. · 6660
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS10 networks present
on quote

Triara Monterey

Triara Mty · 66600
1 networks present
on quote

Equinix MO2 - Monterrey

Equinix, Inc. · 66643
1 baieTier III (indicative)3 networks present
on quote

What Apodaca allows

Apodaca has 3 data centers, operated by Equinix, Inc., Triara Mty. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Apodaca

10 networks are listed at the sites in Apodaca according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Apodaca

A city has no electricity of its own: the sites in Apodaca are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.6% of its electricity from natural gas (2025). The detail: natural gas 61.6%, oil (fuel oil, diesel) 9.4%, hydro 8.1%, solar 7.4%, wind 6%, coal 3%. Fossil fuels (coal, gas, oil) account for 74% of it. A kilowatt-hour there weighs 474 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Apodaca

No earthquake of magnitude 5 or above has been recorded within 200 km of Apodaca since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Apodaca does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Apodaca

The nearest site outside Apodaca is 19 km away, in Monterrey (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Mexico

Advertisement