Compare & price
HomeData centersUkraineDnipropetrovsk

Data centers in Dnipropetrovsk

Dnipropetrovsk has 2 data centers listed on DataColoc, operated notably by GTS, Datasfera. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Dnipropetrovsk (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Dnipropetrovsk, including GTS, Datasfera.

Frequently asked questions

How much does a rack (colocation) cost in Dnipropetrovsk?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Dnipropetrovsk to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Dnipropetrovsk are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Dnipropetrovsk really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Dnipropetrovsk, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€956 – €1,164
Cost per kW per month€170 – €208
Over 3 years (36 months)€34,416 – €41,904

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Dnipropetrovsk →

GTS

GTS · 49000
2 networks present
on quote

Datasfera

Datasfera · 49000
10 networks present
on quote

What Dnipropetrovsk allows

Dnipropetrovsk has 2 data centers, operated by GTS, Datasfera.

Connectivity from Dnipropetrovsk

10 networks are listed at the sites in Dnipropetrovsk according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Google, Meta, Akamai, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Dnipropetrovsk

A city has no electricity of its own: the sites in Dnipropetrovsk are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 55.8% of its electricity from nuclear (2022). The detail: nuclear 55.8%, coal 20.9%, hydro 9.9%, natural gas 6.4%, solar 4.6%, wind 1.3%. Fossil fuels (coal, gas, oil) account for 27.8% of it. A kilowatt-hour there weighs 250 g of CO2, i.e. 1.8 times less than the world average (458 g), 2022 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 8.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Dnipropetrovsk

No earthquake of magnitude 5 or above has been recorded within 200 km of Dnipropetrovsk since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Dnipropetrovsk does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Dnipropetrovsk

The nearest site outside Dnipropetrovsk is 1 km away, in Dnepropetrovsk. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Ukraine

Advertisement