Compare & price
HomeData centersTürkiyeIzmir

Data centers in Izmir

Izmir has 2 data centers listed on DataColoc, operated notably by Alastyr Telekomunikasyon A.S., VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Izmir (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Izmir, including Alastyr Telekomunikasyon A.S., VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI.

Frequently asked questions

How much does a rack (colocation) cost in Izmir?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Izmir to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Izmir are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Izmir really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Izmir, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€857 – €1,286
Cost per kW per month€151 – €231
Over 3 years (36 months)€30,852 – €46,296

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Izmir →

Alastyr Datacenter

Alastyr Telekomunikasyon A.S. · 35090
1 networks present
on quote

Vodafone Gaziemir MTX

VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI · 35410
on quote

What Izmir allows

Izmir has 2 data centers, operated by Alastyr Telekomunikasyon A.S., VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI.

Connectivity from Izmir

1 network is listed at the sites in Izmir according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Izmir

A city has no electricity of its own: the sites in Izmir are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 34.3% (2025). The detail: coal 34.3%, natural gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%, geothermal and other renewables 3%. Fossil fuels (coal, gas, oil) account for 56.7% of it. A kilowatt-hour there weighs 475 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Izmir

Since 1970, 29 earthquakes of magnitude 5 or above have been recorded within 100 km of Izmir, and 102 within 200 km. The strongest: magnitude 7.2 in 1981, 192 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Izmir does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Izmir

The nearest site outside Izmir is 4 km away, in BAYRAKLI. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Türkiye