Compare & price
HomeData centersTürkiyeEsenyurt

Data centers in Esenyurt

Esenyurt has 1 data center listed on DataColoc, operated notably by VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Esenyurt →

Vodafone Esenyurt MTX

VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI · 34517
17 networks present
on quote

What Esenyurt allows

The data center listed in Esenyurt is operated by VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI.

Connectivity from Esenyurt

17 networks are listed at the sites in Esenyurt according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Microsoft Azure, Tencent Cloud, Meta, Akamai, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Esenyurt

A city has no electricity of its own: the sites in Esenyurt are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 34.3% (2025). The detail: coal 34.3%, natural gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%, geothermal and other renewables 3%. Fossil fuels (coal, gas, oil) account for 56.7% of it. A kilowatt-hour there weighs 475 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Esenyurt

Since 1970, 13 earthquakes of magnitude 5 or above have been recorded within 100 km of Esenyurt, and 32 within 200 km. The strongest: magnitude 7.6 in 1999, 105 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Esenyurt does not allow

With a single listed site, Esenyurt cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Esenyurt

The nearest site outside Esenyurt is 26 km away, in Istanbul (19 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Türkiye