Pskov has 1 data center listed on DataColoc, operated notably by Pskovline LTD. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Compare data centers in Pskov →The data center listed in Pskov is operated by Pskovline LTD.
A city has no electricity of its own: the sites in Pskov are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 44.7% (2025). The detail: natural gas 44.7%, coal 18.4%, nuclear 18.3%, hydro 16.7%, oil (fuel oil, diesel) 1.2%. Fossil fuels (coal, gas, oil) account for 64.3% of it. A kilowatt-hour there weighs 450 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
With a single listed site, Pskov cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.