Compare & price
HomeData centersRussiaYaroslavl

Data centers in Yaroslavl

Yaroslavl has 2 data centers listed on DataColoc, operated notably by YarTranzitTelecom CJS, Yarnet Ltd.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Yaroslavl (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Yaroslavl, including YarTranzitTelecom CJS, Yarnet Ltd..

Frequently asked questions

How much does a rack (colocation) cost in Yaroslavl?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Yaroslavl to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Yaroslavl are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Yaroslavl really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Yaroslavl, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€903 – €1,332
Cost per kW per month€160 – €239
Over 3 years (36 months)€32,508 – €47,952

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Yaroslavl →

YarTT

YarTranzitTelecom CJS · 150003
on quote

Yarnet Ltd.

Yarnet Ltd. · 150049
on quote

What Yaroslavl allows

Yaroslavl has 2 data centers, operated by YarTranzitTelecom CJS, Yarnet Ltd..

Connectivity from Yaroslavl

1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Yaroslavl

A city has no electricity of its own: the sites in Yaroslavl are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 44.7% (2025). The detail: natural gas 44.7%, coal 18.4%, nuclear 18.3%, hydro 16.7%, oil (fuel oil, diesel) 1.2%. Fossil fuels (coal, gas, oil) account for 64.3% of it. A kilowatt-hour there weighs 450 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Yaroslavl

No earthquake of magnitude 5 or above has been recorded within 200 km of Yaroslavl since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Yaroslavl does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Yaroslavl

The nearest site outside Yaroslavl is 230 km away, in Korolev. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Russia