Compare & price
HomeData centersPolandWroclaw

Data centers in Wroclaw

Wroclaw has 4 data centers listed on DataColoc, operated notably by Korbank S. A., TKTelekom, Orange Polska Spolka Akcyjna, Bestgo.pl. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Wroclaw (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Wroclaw, including Korbank S. A., TKTelekom, Orange Polska Spolka Akcyjna, Bestgo.pl.

Frequently asked questions

How much does a rack (colocation) cost in Wroclaw?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Wroclaw to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Wroclaw are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Wroclaw really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Wroclaw, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€850 – €1,500
Cost per kW per month€150 – €270
Over 3 years (36 months)€30,600 – €54,000

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Wroclaw →

Korbank Data Center

Korbank S. A.
Sovereign (outside US CLOUD Act)
on quote

TKTelekom - Joanitow

TKTelekom
Sovereign (outside US CLOUD Act)
on quote

Orange Polska // Wrocław

Orange Polska Spolka Akcyjna
Sovereign (outside US CLOUD Act)
on quote

Bestgo.pl

Bestgo.pl · 54-061
Sovereign (outside US CLOUD Act)
on quote

What Wroclaw allows

Wroclaw has 4 data centers, operated by Korbank S. A., TKTelekom, Orange Polska Spolka Akcyjna, Bestgo.pl.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Wroclaw

A city has no electricity of its own: the sites in Wroclaw are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 50.4% of its electricity from coal (2025). The detail: coal 50.4%, natural gas 14.3%, wind 14.2%, solar 11.3%, bioenergy 4.9%, oil (fuel oil, diesel) 3.8%. Fossil fuels (coal, gas, oil) account for 68.5% of it. A kilowatt-hour there weighs 589 g of CO2, i.e. 1.3 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 20.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Wroclaw

Since 1970, 6 earthquakes of magnitude 5 or above have been recorded within 100 km of Wroclaw, and 7 within 200 km. The strongest: magnitude 5.8 in 1983, 93 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Wroclaw does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Wroclaw

The nearest site outside Wroclaw is 79 km away, in Opole. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Poland