Data centers in Opole

Opole has 1 data center listed on DataColoc, operated notably by Park Naukowo-Technologiczny w Opolu Sp. z o.o.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Opole →

PNT DATA CENTER

Park Naukowo-Technologiczny w Opolu Sp. z o.o.
Sovereign (outside US CLOUD Act)
on quote

What Opole allows

The data center listed in Opole is operated by Park Naukowo-Technologiczny w Opolu Sp. z o.o..

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Opole

A city has no electricity of its own: the sites in Opole are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 50.4% of its electricity from coal (2025). The detail: coal 50.4%, natural gas 14.3%, wind 14.2%, solar 11.3%, bioenergy 4.9%, oil (fuel oil, diesel) 3.8%. Fossil fuels (coal, gas, oil) account for 68.5% of it. A kilowatt-hour there weighs 589 g of CO2, i.e. 1.3 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 20.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Opole

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Opole, and 7 within 200 km. The strongest: magnitude 5.8 in 1983, 168 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Opole does not allow

With a single listed site, Opole cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Opole

The nearest site outside Opole is 69 km away, in Gliwice. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.