Compare & price
HomeData centersMalaysiaKuching

Data centers in Kuching

Kuching has 3 data centers listed on DataColoc, operated notably by Danawa Resources Sdn Bhd, SACOFA Sdn. Bhd., IRIX. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Kuching (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Kuching, including Danawa Resources Sdn Bhd, SACOFA Sdn. Bhd., IRIX.

Frequently asked questions

How much does a rack (colocation) cost in Kuching?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Kuching to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Kuching are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Kuching really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Kuching, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€697 – €825
Cost per kW per month€123 – €143
Over 3 years (36 months)€25,092 – €29,700

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a MYR conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Kuching →

DANAWA DC, Kuching

Danawa Resources Sdn Bhd · 93350
1 networks present
on quote

SACOFA Kuching

SACOFA Sdn. Bhd. · 93400
on quote

irix Tier IV DC @ Santubong 1

IRIX · 93010
2 networks present
on quote

What Kuching allows

Kuching has 3 data centers, operated by Danawa Resources Sdn Bhd, SACOFA Sdn. Bhd., IRIX.

Connectivity from Kuching

2 networks are listed at the sites in Kuching according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, Google, Microsoft Azure, Tencent Cloud, Meta, Netflix, Akamai and 2 more: they are present at the exchange points where 2 of the 3 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Kuching

A city has no electricity of its own: the sites in Kuching are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 44.6% (2025). The detail: coal 44.6%, natural gas 33.8%, hydro 17.5%, solar 2.2%, oil (fuel oil, diesel) 1%, bioenergy 0.9%. Fossil fuels (coal, gas, oil) account for 79.4% of it. A kilowatt-hour there weighs 602 g of CO2, i.e. 1.3 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 21.4 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Kuching

No earthquake of magnitude 5 or above has been recorded within 200 km of Kuching since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Kuching does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Kuching

The nearest site outside Kuching is 734 km away, in Johor Bahru (6 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Malaysia

Advertisement