Compare & price
Home › Data centers › Malaysia › Gelang Patah

Server colocation & hosting in Gelang Patah

Gelang Patah has 1 data center listed on DataColoc, operated notably by ST Telemedia Global Data Centres (STT GDC). Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Gelang Patah (server housing) relies on one listed data center, operated by ST Telemedia Global Data Centres (STT GDC). Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Gelang Patah?

DataColoc lists 1 data center offering colocation in Gelang Patah (ST Telemedia Global Data Centres (STT GDC)). The nearest alternatives are listed below, with their distance.

What connectivity is available in Gelang Patah?

IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Gelang Patah?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Gelang Patah →

STT Johor 1

ST Telemedia Global Data Centres (STT GDC) · 81550
on quote

What Gelang Patah allows

The data center listed in Gelang Patah is operated by ST Telemedia Global Data Centres (STT GDC).

The electricity behind Gelang Patah

A city has no electricity of its own: the sites in Gelang Patah are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 44.6% (2025). The detail: coal 44.6%, natural gas 33.8%, hydro 17.5%, solar 2.2%, oil (fuel oil, diesel) 1%, bioenergy 0.9%. Fossil fuels (coal, gas, oil) account for 79.4% of it. A kilowatt-hour there weighs 602 g of CO2, i.e. 1.3 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 21.4 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Gelang Patah

No earthquake of magnitude 5 or above has been recorded within 200 km of Gelang Patah since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Gelang Patah does not allow

With a single listed site, Gelang Patah cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Gelang Patah

The nearest site outside Gelang Patah is 2 km away, in Iskandar Puteri (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Malaysia