Villebon-sur-Yvette has 2 data centers listed on DataColoc, operated notably by Alionis, Scaleway. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Server colocation in Villebon-sur-Yvette (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Villebon-sur-Yvette, including Alionis, Scaleway.
In Villebon-sur-Yvette, observed rates start from 124 €/mo for a 1U server. A full rack (42U) is priced on subscribed power (kVA), IP transit, cross-connects and contract term. Run the comparator for an exact quote for your needs.
Rates start from 124 €/mo for a 1U server; a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Villebon-sur-Yvette to get a costed quote.
None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.
1 of the 2 data centers listed in Villebon-sur-Yvette declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.
Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.
Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.
Beyond listed prices, here is the computed cost of a standard 5 kW rack in Villebon-sur-Yvette, from our open market model (published method, version 2026.07-v1):
| Item | Estimate |
|---|---|
| 5 kW rack, per month | €754 – €1,018 |
| Cost per kW per month | €131 – €177 |
| Over 3 years (36 months) | €27,144 – €36,648 |
What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.
An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.
Compare data centers in Villebon-sur-Yvette →Villebon-sur-Yvette has 2 data centers, operated by Alionis, Scaleway. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1U to baie (1U, 1/4 baie, 1/2 baie, 1 baie, baie): you can start small here, without renting a whole rack. The smallest recorded commitment starts at €124/month for one U, excluding power and connectivity.
1 network is listed at the sites in Villebon-sur-Yvette according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.
Declared certifications: ISO 27001, HDS. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.
A city has no electricity of its own: the sites in Villebon-sur-Yvette are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
No earthquake of magnitude 5 or above has been recorded within 200 km of Villebon-sur-Yvette since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.
Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.
No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth.
The nearest site outside Villebon-sur-Yvette is 3 km away, in Les Ulis. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.