Magny-les-Hameaux has 2 data centers listed on DataColoc, operated notably by Telehouse - Global Data Centers, Telehouse. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Server colocation in Magny-les-Hameaux (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Magny-les-Hameaux, including Telehouse - Global Data Centers, Telehouse.
a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Magny-les-Hameaux to get a costed quote.
None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.
2 of the 2 data centers listed in Magny-les-Hameaux declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.
Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.
Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.
Beyond listed prices, here is the computed cost of a standard 5 kW rack in Magny-les-Hameaux, from our open market model (published method, version 2026.07-v1):
| Item | Estimate |
|---|---|
| 5 kW rack, per month | €945 – €1,073 |
| Cost per kW per month | €164 – €187 |
| Over 3 years (36 months) | €34,020 – €38,628 |
What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.
An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.
Compare data centers in Magny-les-Hameaux →Magny-les-Hameaux has 2 data centers, operated by Telehouse - Global Data Centers, Telehouse. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1/4 baie to 1 baie (1/4 baie, 1/2 baie, 1 baie): you can start small here, without renting a whole rack.
51 networks are listed at the sites in Magny-les-Hameaux according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 4 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, Google, Hetzner, Microsoft Azure, OVHcloud, Scaleway, Apple and 5 more: they are present at the exchange points where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.
Declared certifications: ISO 27001, PCI DSS, ISO 50001. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.
A city has no electricity of its own: the sites in Magny-les-Hameaux are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
No earthquake of magnitude 5 or above has been recorded within 200 km of Magny-les-Hameaux since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.
Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.
No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.
The nearest site outside Magny-les-Hameaux is 7 km away, in Montigny-le-Bretonneux. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.