Compare & price
HomeData centersFranceMontreuil

Data centers in Montreuil

Montreuil has 2 data centers listed on DataColoc, operated notably by Magic OnLine, Smartdc. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Montreuil (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Montreuil, including Magic OnLine, Smartdc.

Colocation pricing in Montreuil

In Montreuil, observed rates start from 49 €/mo for a 1U server. A full rack (42U) is priced on subscribed power (kVA), IP transit, cross-connects and contract term. Run the comparator for an exact quote for your needs.

Frequently asked questions

How much does a rack (colocation) cost in Montreuil?

Rates start from 49 €/mo for a 1U server; a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Montreuil to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Montreuil are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Montreuil really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Montreuil, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€758 – €886
Cost per kW per month€131 – €154
Over 3 years (36 months)€27,288 – €31,896

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Montreuil →

Magic OnLine

Magic OnLine · 93100
1 kW/rack1U · 1/4 baie · 1/2 baie24/7 accessSovereign (outside US CLOUD Act)
on quote

Smartdc Paris

Smartdc · 93100 Montreuil
1 kW/rack1U · 1/4 baie · 1/2 baieSovereign (outside US CLOUD Act)1 networks present
on quote

What Montreuil allows

Montreuil has 2 data centers, operated by Magic OnLine, Smartdc. Available formats range from 1U to 1 baie (1U, 1/4 baie, 1/2 baie, 1 baie): you can start small here, without renting a whole rack. The smallest recorded commitment starts at €49/month for one U, excluding power and connectivity.

Connectivity from Montreuil

1 network is listed at the sites in Montreuil according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Montreuil

A city has no electricity of its own: the sites in Montreuil are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Montreuil

No earthquake of magnitude 5 or above has been recorded within 200 km of Montreuil since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Montreuil does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth.

Other cities with data centers near Montreuil

The nearest site outside Montreuil is 4 km away, in Les Lilas. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in France

Advertisement