Compare & price
Home › Data centers › France › Les Lilas

Server colocation & hosting in Les Lilas

Les Lilas has 1 data center listed on DataColoc, operated notably by TDF. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Les Lilas (server housing) relies on one listed data center, operated by TDF. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 2 networks. For a wider choice, nearby cities and their distances are listed below.

Colocation pricing in Les Lilas

In Les Lilas, the observed rate starts from 124 €/mo for a 1U server; a full rack is priced on power (kVA), IP transit and cross-connects.

Frequently asked questions

How many data centers in Les Lilas?

DataColoc lists 1 data center offering colocation in Les Lilas (TDF). The nearest alternatives are listed below, with their distance.

What connectivity is available in Les Lilas?

The site lists up to 2 networks. IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Les Lilas?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Les Lilas →

TDF Datacenter Paris Fort de Romainville

TDF · 93260
1 kW/rack1U · 1/4 baie · 1/2 baie24/7 accessSovereign (outside US CLOUD Act)2 networks present
on quote

What Les Lilas allows

The data center listed in Les Lilas is operated by TDF. Available formats range from 1U to 1 baie (1U, 1/4 baie, 1/2 baie, 1 baie): you can start small here, without renting a whole rack. The smallest recorded commitment starts at €124/month for one U, excluding power and connectivity.

Connectivity from Les Lilas

2 networks are listed at the sites in Les Lilas according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Les Lilas

A city has no electricity of its own: the sites in Les Lilas are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Les Lilas

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Les Lilas, and 1 within 200 km. The strongest: magnitude 5.5 in 1976, 200 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Les Lilas does not allow

With a single listed site, Les Lilas cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth.

Getting to the site in Les Lilas

The closest stop to TDF Datacenter Paris Fort de Romainville is Serge Gainsbourg, 562 m away as the crow flies, with 5 more within 2.5 km. That distance is measured straight from the site, not along a walking route.

Lines serving these stops: RER E, metro 5, metro 3, metro 11, metro 3bis, tram T3b, metro 7bis.

The nearest airport with scheduled flights is Charles de Gaulle International Airport (CDG), 23 km by road, about 24 min outside traffic. Military fields and general aviation are excluded from this calculation.

Stops and lines: OpenStreetMap (ODbL), © OpenStreetMap contributors. Airports: OurAirports. Road route: OSRM. Surveyed on 2026-10-05.

Other cities with data centers near Les Lilas

The nearest site outside Les Lilas is 4 km away, in Aubervilliers (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in France