Compare & price
HomeData centersFranceCesson-Sévigné

Data centers in Cesson-Sévigné

Cesson-Sévigné has 3 data centers listed on DataColoc, operated notably by UltraEdge. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Cesson-Sévigné (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Cesson-Sévigné, including UltraEdge.

Frequently asked questions

How much does a rack (colocation) cost in Cesson-Sévigné?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Cesson-Sévigné to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Cesson-Sévigné are ISO 27001 certified?

1 of the 3 data centers listed in Cesson-Sévigné declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Cesson-Sévigné really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Cesson-Sévigné, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€790 – €918
Cost per kW per month€137 – €159
Over 3 years (36 months)€28,440 – €33,048

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Cesson-Sévigné →

UltraEdge Rennes

UltraEdge · 35510
Sovereign (outside US CLOUD Act)Cert.: ISO 27001, ISO 50001, HDS9 networks present
on quote

Neuf Cesson

· 35510
Sovereign (outside US CLOUD Act)5 networks present
on quote

TDF Datacenter Rennes Cesson

· 35510
Sovereign (outside US CLOUD Act)10 networks present
on quote

What Cesson-Sévigné allows

Cesson-Sévigné has 3 data centers, operated by UltraEdge.

Connectivity from Cesson-Sévigné

10 networks are listed at the sites in Cesson-Sévigné according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Declared certifications: ISO 27001, ISO 50001, HDS. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Cesson-Sévigné

A city has no electricity of its own: the sites in Cesson-Sévigné are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Cesson-Sévigné

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Cesson-Sévigné, and 1 within 200 km. The strongest: magnitude 5 in 2001, 166 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Cesson-Sévigné does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Cesson-Sévigné

The nearest site outside Cesson-Sévigné is 2 km away, in Rennes. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in France

Advertisement