HomeData centersFranceCouëron

Data centers in Couëron

Couëron has 1 data center listed on DataColoc, operated notably by Etix Everywhere. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Couëron →

ETIX Nantes #3

Etix Everywhere · 44220
Sovereign (outside US CLOUD Act)Cert.: ISO 27001, ISO 50001, HDS, PCI DSS10 networks present
on quote

What Couëron allows

The data center listed in Couëron is operated by Etix Everywhere.

Connectivity from Couëron

10 networks are listed at the sites in Couëron according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Declared certifications: ISO 27001, ISO 50001, HDS, PCI DSS. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Couëron

A city has no electricity of its own: the sites in Couëron are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Couëron

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Couëron, and 3 within 200 km. The strongest: magnitude 5.7 in 1972, 147 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Couëron does not allow

With a single listed site, Couëron cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Couëron

The nearest site outside Couëron is 3 km away, in Saint-Herblain (3 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.