Compare & price
HomeData centersUnited StatesHouston

Data centers in Houston

Houston has 20 data centers listed on DataColoc, operated notably by Digital Realty, Equinix, Inc., Netrality Data Centers, JCCH, Ltd, DataBank, Ltd., Alpheus Communications. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Houston (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 20 data centers offering colocation in Houston, including Digital Realty, Equinix, Inc., Netrality Data Centers, JCCH, Ltd.

Frequently asked questions

How much does a rack (colocation) cost in Houston?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 20 data centers in Houston to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Houston are ISO 27001 certified?

1 of the 20 data centers listed in Houston declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Houston really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Houston, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€661 – €1,038
Cost per kW per month€122 – €177
Over 3 years (36 months)€23,796 – €37,368

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a USD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Houston →

Digital Realty HOU (12001 North Freeway)

Digital Realty · 77060
1 baieTier III (indicative)14 networks present
on quote

Equinix HO1 - Houston

Equinix, Inc. · 77032
1 baieTier III (indicative)Cert.: HIPAA, ISO 22301, ISO 27001, ISO 500014 networks present
on quote

Netrality Houston - 1301 Fannin

Netrality Data Centers · 77002
31 networks present
on quote

3500 Garrott

JCCH, Ltd · 77006
on quote

Databank Houston Galleria (HOU5)

DataBank, Ltd. · 77027
8 networks present
on quote

Databank Houston West (HOU1) (HOU2)

DataBank, Ltd. · 77041
36 networks present
on quote

Alpheus Houston (777 Walker Street)

Alpheus Communications · 77002
2 networks present
on quote

Data Foundry Houston 1

Data Foundry, Inc. · 77056
3 networks present
on quote

Data Foundry Houston 2

Data Foundry, Inc. · 77067
12 networks present
on quote

INAP Houston

INAP Holding LLC · 77002
4 networks present
on quote

Consolidated - 811 Louisiana

Consolidated Communications, Inc. · 77002
4 networks present
on quote

InterConnX Realty

InterConnX Realty · 77002
on quote

FIBERTOWN Houston Data Center

FIBERTOWN · 77060-1702
13 networks present
on quote

Quasar Data Center

Quasar Data Center · 77002
7 networks present
on quote

Lighthouse Data Center (Houston)

PS Lightwave · 77063
4 networks present
on quote

Databank Houston West (HOU3)

DataBank, Ltd. · 77041
1 networks present
on quote

Serverfarm CTX1 Houston

Serverfarm
on quote

EdgeConneX Houston TX

EdgeConneX
Tier III (indicative)
on quote

TierPoint Houston TX

TierPoint
on quote

Cogent Houston

Cogent Communications, Inc. · 12061
on quote

What Houston allows

Houston has 20 data centers, operated by Digital Realty, Equinix, Inc., Netrality Data Centers, JCCH, Ltd. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Houston

36 networks are listed at the sites in Houston according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 6 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, DigitalOcean, Google, Hetzner, Microsoft Azure, OVHcloud, Meta, Netflix and 3 more: they are present at the exchange points where 5 of the 20 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: HIPAA, ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Houston

A city has no electricity of its own: the sites in Houston are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Houston

No earthquake of magnitude 5 or above has been recorded within 200 km of Houston since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Houston does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Houston

The nearest site outside Houston is 29 km away, in Spring. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States

Advertisement