Compare & price
HomeData centersUnited StatesCollege Station

Data centers in College Station

College Station has 1 data center listed on DataColoc, operated notably by Crosspoint Data, LLC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in College Station (server housing) relies on one listed data center, operated by Crosspoint Data, LLC. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 1 network. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in College Station?

DataColoc lists 1 data center offering colocation in College Station (Crosspoint Data, LLC). The nearest alternatives are listed below, with their distance.

What connectivity is available in College Station?

The site lists up to 1 network. IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in College Station?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in College Station →

Crosspoint Data College Station

Crosspoint Data, LLC · 77845
1 networks present
on quote

What College Station allows

The data center listed in College Station is operated by Crosspoint Data, LLC.

Connectivity from College Station

1 network is listed at the sites in College Station according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind College Station

A city has no electricity of its own: the sites in College Station are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under College Station

No earthquake of magnitude 5 or above has been recorded within 200 km of College Station since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What College Station does not allow

With a single listed site, College Station cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near College Station

The nearest site outside College Station is 12 km away, in Bryan. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States