Compare & price
HomeData centersSouth KoreaGeumcheon-gu

Data centers in Geumcheon-gu

Geumcheon-gu has 3 data centers listed on DataColoc, operated notably by DCI Data Centers, NetRealty, kt cloud Co., Ltd. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Geumcheon-gu (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Geumcheon-gu, including DCI Data Centers, NetRealty, kt cloud Co., Ltd.

Frequently asked questions

How much does a rack (colocation) cost in Geumcheon-gu?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Geumcheon-gu to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Geumcheon-gu are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Geumcheon-gu really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Geumcheon-gu, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€977 – €1,150
Cost per kW per month€173 – €204
Over 3 years (36 months)€35,172 – €41,400

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a KRW conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Geumcheon-gu →

DCI Seoul 01 (SEL01)

DCI Data Centers · 08501
on quote

NetRealty SEL1 - Gasan

NetRealty · 08512
10 networks present
on quote

kt cloud Gasan

kt cloud Co., Ltd · 08593
1 networks present
on quote

What Geumcheon-gu allows

Geumcheon-gu has 3 data centers, operated by DCI Data Centers, NetRealty, kt cloud Co., Ltd.

Connectivity from Geumcheon-gu

10 networks are listed at the sites in Geumcheon-gu according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Microsoft Azure, Tencent Cloud: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Geumcheon-gu

A city has no electricity of its own: the sites in Geumcheon-gu are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 31.1% (2025). The detail: coal 31.1%, nuclear 29.6%, natural gas 27.9%, solar 6.1%, bioenergy 3.2%, oil (fuel oil, diesel) 1%. Fossil fuels (coal, gas, oil) account for 60% of it. A kilowatt-hour there weighs 417 g of CO2, i.e. 1.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 14.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Geumcheon-gu

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Geumcheon-gu, and 1 within 200 km. The strongest: magnitude 5.1 in 1982, 137 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Geumcheon-gu does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Geumcheon-gu

The nearest site outside Geumcheon-gu is 1 km away, in Guro-gu (3 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in South Korea

Advertisement