Compare & price
Home › Data centers › Canada › Winnipeg

Server colocation & hosting in Winnipeg

Winnipeg has 10 data centers listed on DataColoc, operated notably by Equinix, Manitoba Hydro Telecom, Bell MTS Data Centres G.P., Havard Management, LES.NET (1996) INC, The Exchange Group. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Winnipeg (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 10 data centers offering colocation in Winnipeg, including Equinix, Manitoba Hydro Telecom, Bell MTS Data Centres G.P., Havard Management. Its top-connected site lists 27 networks and 1 internet exchange point (IXP).

Frequently asked questions

How much does a rack (colocation) cost in Winnipeg?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 10 data centers in Winnipeg to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Winnipeg are ISO 27001 certified?

1 of the 10 data centers listed in Winnipeg declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Winnipeg really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Winnipeg, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€857 – €1,420
Cost per kW per month€151 – €255
Over 3 years (36 months)€30,852 – €51,120

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a CAD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Winnipeg →

Equinix WI1 - Winnipeg

Equinix
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Manitoba Hydro Telecom Data Centre

Manitoba Hydro Telecom
on quote

Bell MTS Data Centres G.P. - DC01

Bell MTS Data Centres G.P.
on quote

201 Portage

Havard Management
on quote

LES.NET YWG1

LES.NET (1996) INC
on quote

LES.NET YWG4

LES.NET (1996) INC
on quote

Global Server Center

The Exchange Group · R3B 0V3
27 networks present
on quote

LES.NET YWG2

LES.NET (1996) INC · R3C
7 networks present
on quote

Richardson College for the Envrionment and Sciences

University of Winnipeg · R3B 2G3
1 networks present
on quote

University of Winnipeg

University of Winnipeg · R3B 2R6
1 networks present
on quote

What Winnipeg allows

Winnipeg has 10 data centers, operated by Equinix, Manitoba Hydro Telecom, Bell MTS Data Centres G.P., Havard Management. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Winnipeg

27 networks are listed at the sites in Winnipeg according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Cloudflare: they are present at the exchange point where 2 of the 10 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Winnipeg

A city has no electricity of its own: the sites in Winnipeg are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.8% of its electricity from hydro (2025). The detail: hydro 52.8%, natural gas 17.8%, nuclear 13.1%, wind 7.9%, coal 4.1%, bioenergy 1.6%. Fossil fuels (coal, gas, oil) account for 23.1% of it. A kilowatt-hour there weighs 191 g of CO2, i.e. 2.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 6.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Winnipeg

No earthquake of magnitude 5 or above has been recorded within 200 km of Winnipeg since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Winnipeg does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Winnipeg

The nearest site outside Winnipeg is 534 km away, in Regina (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Canada

Advertisement