Compare & price
HomeData centersCanadaSaskatoon

Data centers in Saskatoon

Saskatoon has 4 data centers listed on DataColoc, operated notably by Saskatoon Internet Exchange Inc, Saskatchewan Telecommunications, VDC Virtual Data Corp., Innovation Saskatchewan. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Saskatoon (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Saskatoon, including Saskatoon Internet Exchange Inc, Saskatchewan Telecommunications, VDC Virtual Data Corp., Innovation Saskatchewan.

Frequently asked questions

How much does a rack (colocation) cost in Saskatoon?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Saskatoon to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Saskatoon are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Saskatoon really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Saskatoon, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€850 – €1,500
Cost per kW per month€150 – €270
Over 3 years (36 months)€30,600 – €54,000

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a CAD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Saskatoon →

Innovation Place - 121RD

Saskatoon Internet Exchange Inc
on quote

SaskTel Saskatoon North

Saskatchewan Telecommunications
on quote

VDC BlackSun 121 Saskatoon

VDC Virtual Data Corp.
on quote

Innovation Place - Saskatoon

Innovation Saskatchewan · S7N 1K2
1 networks present
on quote

What Saskatoon allows

Saskatoon has 4 data centers, operated by Saskatoon Internet Exchange Inc, Saskatchewan Telecommunications, VDC Virtual Data Corp., Innovation Saskatchewan.

Connectivity from Saskatoon

1 network is listed at the sites in Saskatoon according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Saskatoon

A city has no electricity of its own: the sites in Saskatoon are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.8% of its electricity from hydro (2025). The detail: hydro 52.8%, natural gas 17.8%, nuclear 13.1%, wind 7.9%, coal 4.1%, bioenergy 1.6%. Fossil fuels (coal, gas, oil) account for 23.1% of it. A kilowatt-hour there weighs 191 g of CO2, i.e. 2.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 6.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Saskatoon

No earthquake of magnitude 5 or above has been recorded within 200 km of Saskatoon since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Saskatoon does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Saskatoon

The nearest site outside Saskatoon is 238 km away, in Regina (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Canada