Compare & price
HomeData centersCanadaToronto

Data centers in Toronto

Toronto has 26 data centers listed on DataColoc, operated notably by Digital Realty, Lumen Technologies Inc, Telehouse - Global Data Centers, Equinix, Canada15Edge Data Centers, eStruxture Data Centers Inc.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Toronto (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 26 data centers offering colocation in Toronto, including Digital Realty, Lumen Technologies Inc, Telehouse - Global Data Centers, Equinix.

Frequently asked questions

How much does a rack (colocation) cost in Toronto?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 26 data centers in Toronto to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Toronto are ISO 27001 certified?

3 of the 26 data centers listed in Toronto declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Toronto really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Toronto, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,405
Cost per kW per month€152 – €252
Over 3 years (36 months)€31,068 – €50,580

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a CAD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Toronto →

Digital Realty YYZ12 Toronto (151 Front Street)

Digital Realty
1 baieTier III (indicative)
on quote

Level(3) Toronto

Lumen Technologies Inc
on quote

Telehouse Toronto (151 Front St West)

Telehouse - Global Data Centers
1/4 baieTier III (indicative)
on quote

Equinix TR2 - Toronto

Equinix
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Telehouse Toronto (905 King Street West)

Telehouse - Global Data Centers
1/4 baieTier III (indicative)
on quote

Canada15Edge Data Center

Canada15Edge Data Centers
on quote

eStruxture TOR-3

eStruxture Data Centers Inc.
on quote

eStruxture TOR-2

eStruxture Data Centers Inc.
on quote

eStruxture TOR-1

eStruxture Data Centers Inc.
on quote

eStruxture TOR-4

eStruxture Data Centers Inc.
on quote

CentriLogic York (YOR)

CentriLogic
on quote

210 Sheppard Avenue East

Internet Light and Power Inc.
on quote

1YongeColo

Amanah Tech Inc.
on quote

Equinix TR4 - Toronto (formerly Q9 Toronto 2/3/4)

Equinix, Inc.
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Equinix TR1 Toronto

Equinix
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Digital Realty YYZ11 Toronto

Digital Realty
1 baieTier III (indicative)
on quote

Telehouse Toronto (250 Front St West)

Telehouse
1/4 baieTier III (indicative)
on quote

Cologix TOR3

Cologix
Tier III (indicative)
on quote

Cologix TOR2

Cologix
Tier III (indicative)
on quote

Cologix TOR1 Toronto

Cologix
Tier III (indicative)
on quote

Neutral Data Toronto

Neutral Data Centers Corp. · M5J 2N1
6 networks present
on quote

Cologix TOR1

Cologix, Inc. · M5J2N1
Tier III (indicative)85 networks present
on quote

Bell Toronto

Bell Canada (formally Group Telecom) · M5J 2N1
6 networks present
on quote

Coloware YTZ1

Coloware · M5J
33 networks present
on quote

Cogent Toronto

Cogent Communications, Inc. · M2J1R3
7 networks present
on quote

EXA Datacenter Toronto

EXA Infrastructure · M5V 3G6
3 networks present
on quote

What Toronto allows

Toronto has 26 data centers, operated by Digital Realty, Lumen Technologies Inc, Telehouse - Global Data Centers, Equinix. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1/4 baie: you can start small here, without renting a whole rack.

Connectivity from Toronto

85 networks are listed at the sites in Toronto according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 3 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, DigitalOcean, Google, IBM Cloud, Microsoft Azure, Oracle Cloud, OVHcloud and 5 more: they are present at the exchange points where 3 of the 26 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Toronto

A city has no electricity of its own: the sites in Toronto are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.8% of its electricity from hydro (2025). The detail: hydro 52.8%, natural gas 17.8%, nuclear 13.1%, wind 7.9%, coal 4.1%, bioenergy 1.6%. Fossil fuels (coal, gas, oil) account for 23.1% of it. A kilowatt-hour there weighs 191 g of CO2, i.e. 2.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 6.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Toronto

No earthquake of magnitude 5 or above has been recorded within 200 km of Toronto since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Toronto does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Toronto

The nearest site outside Toronto is 12 km away, in North York (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Canada

Advertisement