Compare & price
Home › Data centers › Canada › Markham

Server colocation & hosting in Markham

Markham has 6 data centers listed on DataColoc, operated notably by Digital Realty, Equinix, Cologix, Centersquare, Nuday Networks Inc.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Markham (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 6 data centers offering colocation in Markham, including Digital Realty, Equinix, Cologix, Centersquare. Its top-connected site lists 3 networks and 1 internet exchange point (IXP).

Frequently asked questions

How much does a rack (colocation) cost in Markham?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 6 data centers in Markham to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Markham are ISO 27001 certified?

1 of the 6 data centers listed in Markham declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Markham really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Markham, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€928 – €1,312
Cost per kW per month€164 – €235
Over 3 years (36 months)€33,408 – €47,232

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a CAD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Markham →

Digital Realty YYZ10 Toronto (371 Gough)

Digital Realty
1 baieTier III (indicative)
on quote

Equinix TR5 - Toronto

Equinix
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS
on quote

Cologix TOR4

Cologix
Tier III (indicative)
on quote

Cologix TOR5

Cologix
Tier III (indicative)
on quote

Centersquare Toronto (YYZ2)

Centersquare · L3R 5R5
3 networks present
on quote

Nuday DC1

Nuday Networks Inc. · L3R 3J7
3 networks present
on quote

What Markham allows

Markham has 6 data centers, operated by Digital Realty, Equinix, Cologix, Centersquare. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Markham

3 networks are listed at the sites in Markham according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Microsoft Azure, OVHcloud, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Markham

A city has no electricity of its own: the sites in Markham are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 52.8% of its electricity from hydro (2025). The detail: hydro 52.8%, natural gas 17.8%, nuclear 13.1%, wind 7.9%, coal 4.1%, bioenergy 1.6%. Fossil fuels (coal, gas, oil) account for 23.1% of it. A kilowatt-hour there weighs 191 g of CO2, i.e. 2.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 6.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Markham

No earthquake of magnitude 5 or above has been recorded within 200 km of Markham since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Markham does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Markham

The nearest site outside Markham is 12 km away, in North York (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Canada

Advertisement