Bremen has 16 data centers listed on DataColoc, operated notably by euNetworks Group, LWLcom GmbH, PLUTEX GmbH, ColocationIX GmbH, Ewe, EXA Infrastructure. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Server colocation in Bremen (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 16 data centers offering colocation in Bremen, including euNetworks Group, LWLcom GmbH, PLUTEX GmbH, ColocationIX GmbH.
a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 16 data centers in Bremen to get a costed quote.
None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.
Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.
Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.
Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.
Beyond listed prices, here is the computed cost of a standard 5 kW rack in Bremen, from our open market model (published method, version 2026.07-v1):
| Item | Estimate |
|---|---|
| 5 kW rack, per month | €1,107 – €1,284 |
| Cost per kW per month | €201 – €232 |
| Over 3 years (36 months) | €39,852 – €46,224 |
What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.
An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.
Compare data centers in Bremen →Bremen has 16 data centers, operated by euNetworks Group, LWLcom GmbH, PLUTEX GmbH, ColocationIX GmbH.
6 networks are listed at the sites in Bremen according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.
Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.
A city has no electricity of its own: the sites in Bremen are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
No earthquake of magnitude 5 or above has been recorded within 200 km of Bremen since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.
Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.
No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.
The nearest site outside Bremen is 34 km away, in Verden. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.