Compare & price
HomeData centersGermanyHamburg

Data centers in Hamburg

Hamburg has 23 data centers listed on DataColoc, operated notably by NTT DATA's Global Data Centers division, Equinix, Inc., nLighten HQ BV, Penta C.V., NorthC Deutschland GmbH, euNetworks Group. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Hamburg (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 23 data centers offering colocation in Hamburg, including NTT DATA's Global Data Centers division, Equinix, Inc., nLighten HQ BV, Penta C.V..

Frequently asked questions

How much does a rack (colocation) cost in Hamburg?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 23 data centers in Hamburg to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Hamburg are ISO 27001 certified?

1 of the 23 data centers listed in Hamburg declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Hamburg really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Hamburg, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,121 – €1,312
Cost per kW per month€204 – €236
Over 3 years (36 months)€40,356 – €47,232

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Hamburg →

NTT Hamburg 1 Data Center (HAM1)

NTT DATA's Global Data Centers division · 22335
Sovereign (outside US CLOUD Act)Tier III (indicative)8 networks present
on quote

Equinix HH1 - Hamburg

Equinix, Inc. · 22453
1 baieTier III (indicative)Cert.: ISO 22301, ISO 27001, ISO 50001, PCI DSS5 networks present
on quote

nLighten Hamburg HAM1

nLighten HQ BV · 21079
Sovereign (outside US CLOUD Act)2 networks present
on quote

Penta Infra Hamburg HAM01

Penta C.V. · 22335
Sovereign (outside US CLOUD Act)Tier III (indicative)4 networks present
on quote

NorthC Hamburg

NorthC Deutschland GmbH · 20537
Sovereign (outside US CLOUD Act)18 networks present
on quote

euNetworks Colocation Hamburg

euNetworks Group · 20537
Sovereign (outside US CLOUD Act)10 networks present
on quote

Portus/IPHH HH2 (Wendenstrasse 408)

Portus Data Centers · 20537
Sovereign (outside US CLOUD Act)41 networks present
on quote

n@work Hamburg Wendenstraße

n@work Internet Informationssysteme GmbH · 20537
Sovereign (outside US CLOUD Act)15 networks present
on quote

Artfiles w408

Artfiles New Media GmbH · 20537
Sovereign (outside US CLOUD Act)8 networks present
on quote

GlobalConnect Hamburg (HAM1)

GlobalConnect Group · 22335
Sovereign (outside US CLOUD Act)15 networks present
on quote

GlobalConnect Hamburg (HAM2)

GlobalConnect Group · 20537
Sovereign (outside US CLOUD Act)40 networks present
on quote

ITENOS Hamburg (HAM1)

ITENOS GmbH · 22111
Sovereign (outside US CLOUD Act)2 networks present
on quote

AtlasEdge DC Hamburg HAM001

AtlasEdge · 22335
Sovereign (outside US CLOUD Act)5 networks present
on quote

Portus/IPHH HH3 (Wendenstrasse 251)

Portus Data Centers · 20537
Sovereign (outside US CLOUD Act)17 networks present
on quote

GlobalConnect Hamburg (HAM3)

GlobalConnect Group · 20537
Sovereign (outside US CLOUD Act)12 networks present
on quote

n@work Hamburg Grevenweg

n@work Internet Informationssysteme GmbH · 20537
Sovereign (outside US CLOUD Act)3 networks present
on quote

Akquinet HAM01

akquinet outsourcing gGmbH · 22297
Sovereign (outside US CLOUD Act)1 networks present
on quote

Akquinet HAM02

akquinet outsourcing gGmbH · 22337
Sovereign (outside US CLOUD Act)2 networks present
on quote

PlusServer DataStore Hamburg

PlusServer GmbH · 21107
Sovereign (outside US CLOUD Act)1 networks present
on quote

LYNET Hamburg

LYNET Kommunikation AG · 20537
Sovereign (outside US CLOUD Act)
on quote

Akquinet HAM03

akquinet outsourcing gGmbH · 22143
Sovereign (outside US CLOUD Act)3 networks present
on quote

EdgeConneX Hamburg DE

EdgeConneX
Tier III (indicative)
on quote

EXA Edge DC Hamburg

EXA Infrastructure
Sovereign (outside US CLOUD Act)
on quote

What Hamburg allows

Hamburg has 23 data centers, operated by NTT DATA's Global Data Centers division, Equinix, Inc., nLighten HQ BV, Penta C.V.. Declared design level: Tier III. That level describes the building's redundancy, not a contractual availability commitment: only the contract carries one. Available formats range from 1 baie to 1 baie: you can start small here, without renting a whole rack.

Connectivity from Hamburg

41 networks are listed at the sites in Hamburg according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 3 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are DigitalOcean, Google, Hetzner, Microsoft Azure, OVHcloud, Meta, Akamai, Cloudflare: they are present at the exchange points where 9 of the 23 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 22301, ISO 27001, ISO 50001, PCI DSS, SOC 2. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Hamburg

A city has no electricity of its own: the sites in Hamburg are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Hamburg

No earthquake of magnitude 5 or above has been recorded within 200 km of Hamburg since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Hamburg does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Hamburg

The nearest site outside Hamburg is 15 km away, in Norderstedt (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany

Advertisement