Compare & price
HomeData centersGermanyBochum

Data centers in Bochum

Bochum has 2 data centers listed on DataColoc, operated notably by Glasfaser Ruhr GmbH & Co. KG. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Bochum (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Bochum, including Glasfaser Ruhr GmbH & Co. KG.

Frequently asked questions

How much does a rack (colocation) cost in Bochum?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Bochum to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Bochum are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Bochum really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Bochum, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,172 – €1,284
Cost per kW per month€212 – €232
Over 3 years (36 months)€42,192 – €46,224

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Bochum →

TMR Telehouse Bochum

Glasfaser Ruhr GmbH & Co. KG · 44791
1/4 baieSovereign (outside US CLOUD Act)1 networks present
on quote

GFR DataCenter Bochum

Glasfaser Ruhr GmbH & Co. KG · 44793
Sovereign (outside US CLOUD Act)3 networks present
on quote

What Bochum allows

Bochum has 2 data centers, operated by Glasfaser Ruhr GmbH & Co. KG. Available formats range from 1/4 baie to 1/4 baie: you can start small here, without renting a whole rack.

Connectivity from Bochum

3 networks are listed at the sites in Bochum according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Bochum

A city has no electricity of its own: the sites in Bochum are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Bochum

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Bochum, and 3 within 200 km. The strongest: magnitude 5.4 in 1992, 106 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Bochum does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Bochum

The nearest site outside Bochum is 7 km away, in Herne. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany

Advertisement