Compare & price
HomeData centersGermanyHerne

Data centers in Herne

Herne has 1 data center listed on DataColoc, operated notably by Glasfaser Ruhr GmbH & Co. KG. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Herne (server housing) relies on one listed data center, operated by Glasfaser Ruhr GmbH & Co. KG. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 4 networks and 1 internet exchange point (IXP). For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Herne?

DataColoc lists 1 data center offering colocation in Herne (Glasfaser Ruhr GmbH & Co. KG). The nearest alternatives are listed below, with their distance.

What connectivity is available in Herne?

The site lists up to 4 networks and 1 internet exchange point (IXP). IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Herne?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Herne →

GFR DataCenter Herne

Glasfaser Ruhr GmbH & Co. KG · 44623
Sovereign (outside US CLOUD Act)4 networks present
on quote

What Herne allows

The data center listed in Herne is operated by Glasfaser Ruhr GmbH & Co. KG.

Connectivity from Herne

4 networks are listed at the sites in Herne according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Herne

A city has no electricity of its own: the sites in Herne are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, wind, supplies only 27.2% (2025). The detail: wind 27.2%, coal 20.6%, solar 17.9%, natural gas 16.5%, bioenergy 10.1%, hydro 3.9%. Fossil fuels (coal, gas, oil) account for 40.9% of it. A kilowatt-hour there weighs 330 g of CO2, i.e. 1.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 11.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Herne

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Herne, and 3 within 200 km. The strongest: magnitude 5.4 in 1992, 107 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Herne does not allow

With a single listed site, Herne cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Herne

The nearest site outside Herne is 7 km away, in Bochum (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Germany