Compare & price
HomeData centersTürkiyeAnkara

Data centers in Ankara

Ankara has 7 data centers listed on DataColoc, operated notably by Teknotel Telekom, 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S., Mars Datacenter, KERNZEN, Vaultr Veri Merkezi Hizmetleri A.S., VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Ankara (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 7 data centers offering colocation in Ankara, including Teknotel Telekom, 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S., Mars Datacenter, KERNZEN.

Frequently asked questions

How much does a rack (colocation) cost in Ankara?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 7 data centers in Ankara to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Ankara are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Ankara really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Ankara, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,287
Cost per kW per month€152 – €231
Over 3 years (36 months)€31,068 – €46,332

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Ankara →

Teknotel - Ankara

Teknotel Telekom · 06830
1 networks present
on quote

3C1B HUAWEI FUSION DC ANKARA

3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. · 06000
5 networks present
on quote

Mars Datacenter Ankara-1

Mars Datacenter · 06100
10 networks present
on quote

KERNZEN DC ANK-01

KERNZEN · 06200
on quote

VAULTR ANKARA DATACENTER

Vaultr Veri Merkezi Hizmetleri A.S. · 06830
6 networks present
on quote

3C1B TELEKOM TEPEPRIME

3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. · 06800
3 networks present
on quote

Vodafone Pursaklar MTX

VODAFONE NET ILETISIM HIZMETLERI ANONIM SIRKETI · 06145
on quote

What Ankara allows

Ankara has 7 data centers, operated by Teknotel Telekom, 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S., Mars Datacenter, KERNZEN.

Connectivity from Ankara

10 networks are listed at the sites in Ankara according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 3 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Ankara

A city has no electricity of its own: the sites in Ankara are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, coal, supplies only 34.3% (2025). The detail: coal 34.3%, natural gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%, geothermal and other renewables 3%. Fossil fuels (coal, gas, oil) account for 56.7% of it. A kilowatt-hour there weighs 475 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Ankara

Since 1970, 5 earthquakes of magnitude 5 or above have been recorded within 100 km of Ankara, and 18 within 200 km. The strongest: magnitude 7.2 in 1999, 167 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Ankara does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Ankara

The nearest site outside Ankara is 13 km away, in Cankaya. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Türkiye

Advertisement