Compare & price
HomeData centersSwedenKista

Data centers in Kista

Kista has 2 data centers listed on DataColoc, operated notably by Obenet AB, Bahnhof. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Kista (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Kista, including Obenet AB, Bahnhof.

Frequently asked questions

How much does a rack (colocation) cost in Kista?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Kista to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Kista are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Kista really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Kista, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€857 – €1,286
Cost per kW per month€151 – €231
Over 3 years (36 months)€30,852 – €46,296

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Kista →

Obenet Kista Gate

Obenet AB
Sovereign (outside US CLOUD Act)
on quote

Bahnhof Gullan

Bahnhof · 16460
Sovereign (outside US CLOUD Act)2 networks present
on quote

What Kista allows

Kista has 2 data centers, operated by Obenet AB, Bahnhof.

Connectivity from Kista

2 networks are listed at the sites in Kista according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Kista

A city has no electricity of its own: the sites in Kista are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, hydro, supplies only 40% (2025). The detail: hydro 40%, nuclear 27.6%, wind 22.8%, bioenergy 5.8%, solar 2.6%, oil (fuel oil, diesel) 1.2%. Fossil fuels (coal, gas, oil) account for 1.3% of it. A kilowatt-hour there weighs 35 g of CO2, i.e. 13.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Kista

No earthquake of magnitude 5 or above has been recorded within 200 km of Kista since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Kista does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Kista

The nearest site outside Kista is 4 km away, in Spanga. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Sweden