Compare & price
HomeData centersUnited KingdomLeeds

Data centers in Leeds

Leeds has 7 data centers listed on DataColoc, operated notably by (aq) networks limited, 186k Ltd, C.C.S. (Leeds) Ltd, TEMPLUS DATACENTERS, AtlasEdge. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Leeds (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 7 data centers offering colocation in Leeds, including (aq) networks limited, 186k Ltd, C.C.S. (Leeds) Ltd, TEMPLUS DATACENTERS. Its top-connected site lists 22 networks and 1 internet exchange point (IXP).

Frequently asked questions

How much does a rack (colocation) cost in Leeds?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 7 data centers in Leeds to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Leeds are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Leeds really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Leeds, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€969 – €1,273
Cost per kW per month€173 – €224
Over 3 years (36 months)€34,884 – €45,828

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a GBP conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Leeds →

aql DC2

(aq) networks limited · LS10 1JQ
22 networks present
on quote

Leeds DC1

186k Ltd · LS7 2AA
1 networks present
on quote

aql DC5

(aq) networks limited · LS11 5LN
7 networks present
on quote

DC14-Leeds

C.C.S. (Leeds) Ltd · LS14 2AQ
1 networks present
on quote

aql DC3

(aq) networks limited · LS10 1JW
5 networks present
on quote

Templus DC Leeds LEE01

TEMPLUS DATACENTERS · LS12 6DS
3 networks present
on quote

AtlasEdge DC Leeds LBA001

AtlasEdge
on quote

What Leeds allows

Leeds has 7 data centers, operated by (aq) networks limited, 186k Ltd, C.C.S. (Leeds) Ltd, TEMPLUS DATACENTERS.

Connectivity from Leeds

22 networks are listed at the sites in Leeds according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Leeds

A city has no electricity of its own: the sites in Leeds are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 31.1% (2025). The detail: natural gas 31.1%, wind 29.4%, bioenergy 14.1%, nuclear 12.4%, solar 6.6%, oil (fuel oil, diesel) 4.4%. Fossil fuels (coal, gas, oil) account for 35.6% of it. A kilowatt-hour there weighs 217 g of CO2, i.e. 2.1 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 7.7 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Leeds

No earthquake of magnitude 5 or above has been recorded within 200 km of Leeds since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Leeds does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Leeds

The nearest site outside Leeds is 14 km away, in Normanton. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United Kingdom

Advertisement