Data centers in Woerden

Woerden has 2 data centers listed on DataColoc, operated notably by Switch Datacenter Group, HostSlim BV. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Woerden (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Woerden, including Switch Datacenter Group, HostSlim BV.

Frequently asked questions

How much does a rack (colocation) cost in Woerden?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Woerden to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Woerden are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Woerden really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Woerden, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€954 – €1,185
Cost per kW per month€171 – €210
Over 3 years (36 months)€34,344 – €42,660

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Woerden →

Switch Datacenters AMS2

Switch Datacenter Group · 3447GN
3 networks present
on quote

HostSlim

HostSlim BV · 3447 GN
Sovereign (outside US CLOUD Act)1 networks present
on quote

What Woerden allows

Woerden has 2 data centers, operated by Switch Datacenter Group, HostSlim BV.

Connectivity from Woerden

3 networks are listed at the sites in Woerden according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Woerden

A city has no electricity of its own: the sites in Woerden are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 34.9% (2025). The detail: natural gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%, oil (fuel oil, diesel) 3.9%. Fossil fuels (coal, gas, oil) account for 45.9% of it. A kilowatt-hour there weighs 254 g of CO2, i.e. 1.8 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Woerden

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Woerden, and 2 within 200 km. The strongest: magnitude 5.4 in 1992, 121 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Woerden does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Woerden

The nearest site outside Woerden is 14 km away, in IJsselstein. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.