Compare & price
Home › Data centers › Netherlands › Ede

Server colocation & hosting in Ede

Ede has 3 data centers listed on DataColoc, operated notably by BIT BV, Tuxis B.V.. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Ede (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 3 data centers offering colocation in Ede, including BIT BV, Tuxis B.V.. Its top-connected site lists 40 networks and 3 internet exchange points (IXPs).

Frequently asked questions

How much does a rack (colocation) cost in Ede?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 3 data centers in Ede to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Ede are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Ede really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Ede, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€1,068 – €1,180
Cost per kW per month€190 – €209
Over 3 years (36 months)€38,448 – €42,480

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Ede →

BIT-1

BIT BV · 6716 BV
Sovereign (outside US CLOUD Act)13 networks present
on quote

BIT-2

BIT BV · 6716 BP
Sovereign (outside US CLOUD Act)40 networks present
on quote

Tuxis

Tuxis B.V. · 6718 XR
Sovereign (outside US CLOUD Act)1 networks present
on quote

What Ede allows

Ede has 3 data centers, operated by BIT BV, Tuxis B.V..

Connectivity from Ede

40 networks are listed at the sites in Ede according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 3 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, DigitalOcean, Google, Hetzner, IBM Cloud, Microsoft Azure, Oracle Cloud and 8 more: they are present at the exchange points where 2 of the 3 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Ede

A city has no electricity of its own: the sites in Ede are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 34.9% (2025). The detail: natural gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%, oil (fuel oil, diesel) 3.9%. Fossil fuels (coal, gas, oil) account for 45.9% of it. A kilowatt-hour there weighs 254 g of CO2, i.e. 1.8 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 9 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Ede

Since 1970, 1 earthquake of magnitude 5 or above has been recorded within 100 km of Ede, and 2 within 200 km. The strongest: magnitude 5.4 in 1992, 99 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Ede does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Ede

The nearest site outside Ede is 12 km away, in Dodewaard. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Netherlands

Advertisement