Home › Data centers › Papua New Guinea › Port Moresby

Data centers in Port Moresby

Port Moresby has 2 data centers listed on DataColoc, operated notably by Datec PNG Ltd, PNG Nambawan Trophy Ltd. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Port Moresby (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Port Moresby, including Datec PNG Ltd, PNG Nambawan Trophy Ltd.

Frequently asked questions

How much does a rack (colocation) cost in Port Moresby?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Port Moresby to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Port Moresby are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Port Moresby really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Port Moresby, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€850 – €1,500
Cost per kW per month€150 – €270
Over 3 years (36 months)€30,600 – €54,000

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Port Moresby →

Datec Port Moresby

Datec PNG Ltd · 121
on quote

PNG Nambawan Trophy

PNG Nambawan Trophy Ltd · 121
on quote

What Port Moresby allows

Port Moresby has 2 data centers, operated by Datec PNG Ltd, PNG Nambawan Trophy Ltd.

The electricity behind Port Moresby

A city has no electricity of its own: the sites in Port Moresby are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 57.1% of its electricity from oil (fuel oil, diesel) (2024). The detail: oil (fuel oil, diesel) 57.1%, hydro 21.1%, natural gas 19.2%, geothermal and other renewables 2.1%. Fossil fuels (coal, gas, oil) account for 76.3% of it. A kilowatt-hour there weighs 514 g of CO2, i.e. 1.1 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 18.2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What Port Moresby does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

← All data centers in Papua New Guinea