Compare & price
HomeData centersNew ZealandTauranga

Data centers in Tauranga

Tauranga has 4 data centers listed on DataColoc, operated notably by Spark New Zealand Trading Limited, EOL, Chorus New Zealand Limited. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Tauranga (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Tauranga, including Spark New Zealand Trading Limited, EOL, Chorus New Zealand Limited.

Frequently asked questions

How much does a rack (colocation) cost in Tauranga?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Tauranga to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Tauranga are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Tauranga really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Tauranga, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€900 – €1,108
Cost per kW per month€159 – €198
Over 3 years (36 months)€32,400 – €39,888

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Tauranga →

Spark Tauranga Exchange

Spark New Zealand Trading Limited
12 networks present
on quote

StrataGate Datacentre

EOL · 3110
1 networks present
on quote

Chorus Otumoetai Exchange (OTE)

Chorus New Zealand Limited · 3110
2 networks present
on quote

Chorus Tauranga Exchange (TG)

Chorus New Zealand Limited · 3112
7 networks present
on quote

What Tauranga allows

Tauranga has 4 data centers, operated by Spark New Zealand Trading Limited, EOL, Chorus New Zealand Limited.

Connectivity from Tauranga

12 networks are listed at the sites in Tauranga according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Amazon Web Services, Microsoft Azure, Meta, Netflix, Akamai, Cloudflare, Fastly: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Tauranga

A city has no electricity of its own: the sites in Tauranga are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 54.8% of its electricity from hydro (2025). The detail: hydro 54.8%, geothermal and other renewables 21.8%, wind 9.7%, natural gas 8.9%, oil (fuel oil, diesel) 1.5%, bioenergy 1.3%. Fossil fuels (coal, gas, oil) account for 11.5% of it. A kilowatt-hour there weighs 93 g of CO2, i.e. 4.9 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 3.3 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Tauranga

Since 1970, 50 earthquakes of magnitude 5 or above have been recorded within 100 km of Tauranga, and 197 within 200 km. The strongest: magnitude 6.8 in 1984, 165 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Tauranga does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Tauranga

The nearest site outside Tauranga is 51 km away, in Rotorua District (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in New Zealand

Advertisement