Compare & price
HomeData centersNorwayHamar

Data centers in Hamar

Hamar has 2 data centers listed on DataColoc, operated notably by Nordavind DC Sites, Innit AS. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Hamar (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Hamar, including Nordavind DC Sites, Innit AS.

Frequently asked questions

How much does a rack (colocation) cost in Hamar?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Hamar to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Hamar are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Hamar really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Hamar, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€857 – €1,286
Cost per kW per month€151 – €231
Over 3 years (36 months)€30,852 – €46,296

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Hamar →

Nordavind Heggvin

Nordavind DC Sites · 2324
Sovereign (outside US CLOUD Act)
on quote

Innit Hamar

Innit AS · 2318
Sovereign (outside US CLOUD Act)1 networks present
on quote

What Hamar allows

Hamar has 2 data centers, operated by Nordavind DC Sites, Innit AS.

Connectivity from Hamar

1 network is listed at the sites in Hamar according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Hamar

A city has no electricity of its own: the sites in Hamar are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 90% of its electricity from hydro (2025). The detail: hydro 90%, wind 8.4%, natural gas 0.6%. Fossil fuels (coal, gas, oil) account for 1% of it. A kilowatt-hour there weighs 28 g of CO2, i.e. 16.4 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1 tonne of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Hamar

No earthquake of magnitude 5 or above has been recorded within 200 km of Hamar since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Hamar does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Hamar

The nearest site outside Hamar is 19 km away, in Lena. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.