Data centers in Hlaing

Hlaing has 4 data centers listed on DataColoc, operated notably by True Internet Data Center, Myanmar, Myanmar Country Co., Ltd., Yatanarpon Teleport Company Limited, UNIQUE COMM. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Hlaing (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Hlaing, including True Internet Data Center, Myanmar, Myanmar Country Co., Ltd., Yatanarpon Teleport Company Limited, UNIQUE COMM.

Frequently asked questions

How much does a rack (colocation) cost in Hlaing?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Hlaing to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Hlaing are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Hlaing really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Hlaing, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€910 – €1,197
Cost per kW per month€161 – €214
Over 3 years (36 months)€32,760 – €43,092

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Hlaing →

True IDC, Yangon, Myanmar

True Internet Data Center, Myanmar · 11051
7 networks present
on quote

Myanmar Country Co. Yangon

Myanmar Country Co., Ltd. · 11051
1 networks present
on quote

Yatanarpon Teleport DC Yangon

Yatanarpon Teleport Company Limited · 11051
on quote

UNC DataCenter

UNIQUE COMM · 11051
on quote

What Hlaing allows

Hlaing has 4 data centers, operated by True Internet Data Center, Myanmar, Myanmar Country Co., Ltd., Yatanarpon Teleport Company Limited, UNIQUE COMM.

Connectivity from Hlaing

7 networks are listed at the sites in Hlaing according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Akamai: they are present at the exchange point where 2 of the 4 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Hlaing

A city has no electricity of its own: the sites in Hlaing are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 46.1% (2024). The detail: natural gas 46.1%, hydro 46.1%, coal 5.5%, bioenergy 1.2%, oil (fuel oil, diesel) 0.6%, solar 0.6%. Fossil fuels (coal, gas, oil) account for 52.2% of it. A kilowatt-hour there weighs 503 g of CO2, i.e. 1.1 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 17.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Hlaing

Since 1970, 5 earthquakes of magnitude 5 or above have been recorded within 100 km of Hlaing, and 34 within 200 km. The strongest: magnitude 6.1 in 1995, 122 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Hlaing does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Hlaing

The nearest site outside Hlaing is 7 km away, in Yangon (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.