Compare & price
HomeData centersMoldovaChisinau

Data centers in Chisinau

Chisinau has 5 data centers listed on DataColoc, operated notably by Mezon, Trabia, AlexHost SRL, Moldtelecom SA. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Chisinau (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 5 data centers offering colocation in Chisinau, including Mezon, Trabia, AlexHost SRL, Moldtelecom SA.

Frequently asked questions

How much does a rack (colocation) cost in Chisinau?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 5 data centers in Chisinau to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Chisinau are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Chisinau really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Chisinau, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€956 – €1,164
Cost per kW per month€170 – €208
Over 3 years (36 months)€34,416 – €41,904

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Chisinau →

Mezon Business Park

Mezon · 2068
on quote

Trabia

Trabia · 2012
11 networks present
on quote

AlexHost, Republic of Moldova

AlexHost SRL · 2060
1 networks present
on quote

COLO-54 Moldtelecom

Moldtelecom SA · MD2001
on quote

Data City - Moldtelecom

Moldtelecom SA · MD2000
on quote

What Chisinau allows

Chisinau has 5 data centers, operated by Mezon, Trabia, AlexHost SRL, Moldtelecom SA.

Connectivity from Chisinau

11 networks are listed at the sites in Chisinau according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 2 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Google, Hetzner, Microsoft Azure, OVHcloud, Meta, Akamai, Cloudflare: they are present at the exchange points where 3 of the 5 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Chisinau

A city has no electricity of its own: the sites in Chisinau are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 85.2% of its electricity from natural gas (2025). The detail: natural gas 85.2%, hydro 5.7%, oil (fuel oil, diesel) 3.6%, wind 2.6%, solar 2.6%. Fossil fuels (coal, gas, oil) account for 88.8% of it. A kilowatt-hour there weighs 633 g of CO2, i.e. 1.4 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 22.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Chisinau

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Chisinau, and 1 within 200 km. The strongest: magnitude 5.6 in 2014, 182 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Chisinau does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

← All data centers in Moldova

Advertisement