Compare & price
HomeData centersMexicoHermosillo

Data centers in Hermosillo

Hermosillo has 1 data center listed on DataColoc, operated notably by KIO. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Colocation in Hermosillo (server housing) relies on one listed data center, operated by KIO. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 2 networks. For a wider choice, nearby cities and their distances are listed below.

Frequently asked questions

How many data centers in Hermosillo?

DataColoc lists 1 data center offering colocation in Hermosillo (KIO). The nearest alternatives are listed below, with their distance.

What connectivity is available in Hermosillo?

The site lists up to 2 networks. IP transit and cross-connects can be estimated based on your needs using the comparison tool.

Which certifications in Hermosillo?

No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

Compare data centers in Hermosillo →

KIO Hermosillo 1 (HER1)

KIO · 83190
2 networks present
on quote

What Hermosillo allows

The data center listed in Hermosillo is operated by KIO.

Connectivity from Hermosillo

2 networks are listed at the sites in Hermosillo according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Hermosillo

A city has no electricity of its own: the sites in Hermosillo are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.6% of its electricity from natural gas (2025). The detail: natural gas 61.6%, oil (fuel oil, diesel) 9.4%, hydro 8.1%, solar 7.4%, wind 6%, coal 3%. Fossil fuels (coal, gas, oil) account for 74% of it. A kilowatt-hour there weighs 474 g of CO2, i.e. about the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 16.8 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Hermosillo

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Hermosillo, and 21 within 200 km. The strongest: magnitude 6.9 in 2009, 189 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Hermosillo does not allow

With a single listed site, Hermosillo cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Hermosillo

The nearest site outside Hermosillo is 1 km away, in Hermosillo Centro. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Mexico