Compare & price
HomeData centersKazakhstanAlmaty

Data centers in Almaty

Almaty has 4 data centers listed on DataColoc, operated notably by Mobile Telecom-Service LLP, PS Cloud Services, JSC Transtelecom Kazakhstan, 3HCLOUD LLC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Almaty (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Almaty, including Mobile Telecom-Service LLP, PS Cloud Services, JSC Transtelecom Kazakhstan, 3HCLOUD LLC. Its top-connected site lists 3 networks.

Frequently asked questions

How much does a rack (colocation) cost in Almaty?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Almaty to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Almaty are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Almaty really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Almaty, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,071
Cost per kW per month€152 – €191
Over 3 years (36 months)€31,068 – €38,556

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Almaty →

Almaty

Mobile Telecom-Service LLP · 050000
2 networks present
on quote

PS Internet Company DC

PS Cloud Services · 050000
3 networks present
on quote

Almaty TTC Data Center

JSC Transtelecom Kazakhstan · 050000
3 networks present
on quote

3HCloud - ALA-1

3HCLOUD LLC · 050010
on quote

What Almaty allows

Almaty has 4 data centers, operated by Mobile Telecom-Service LLP, PS Cloud Services, JSC Transtelecom Kazakhstan, 3HCLOUD LLC.

Connectivity from Almaty

3 networks are listed at the sites in Almaty according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

The electricity behind Almaty

A city has no electricity of its own: the sites in Almaty are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 54.3% of its electricity from coal (2025). The detail: coal 54.3%, natural gas 29.4%, hydro 8.5%, wind 4.7%, solar 1.6%, oil (fuel oil, diesel) 1.5%. Fossil fuels (coal, gas, oil) account for 85.2% of it. A kilowatt-hour there weighs 805 g of CO2, i.e. 1.8 times the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 28.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Almaty

Since 1970, 8 earthquakes of magnitude 5 or above have been recorded within 100 km of Almaty, and 29 within 200 km. The strongest: magnitude 7.1 in 1978, 143 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Almaty does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Almaty

The nearest site outside Almaty is 832 km away, in Semey. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Kazakhstan

Advertisement