Data centers in Reykjavik

Reykjavik has 9 data centers listed on DataColoc, operated notably by DataCell, Internet á Íslandi hf, Opin Kerfi hf., Mila hf., Stormur Datacenters ehf., Borealis Data Center. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Reykjavik (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 9 data centers offering colocation in Reykjavik, including DataCell, Internet á Íslandi hf, Opin Kerfi hf., Mila hf..

Frequently asked questions

How much does a rack (colocation) cost in Reykjavik?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 9 data centers in Reykjavik to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Reykjavik are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Reykjavik really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Reykjavik, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,200
Cost per kW per month€152 – €215
Over 3 years (36 months)€31,068 – €43,200

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Reykjavik →

DataCell Reykjavik 1

DataCell · 101
Sovereign (outside US CLOUD Act)1 networks present
on quote

RIX-K2

Internet á Íslandi hf · 104
Sovereign (outside US CLOUD Act)8 networks present
on quote

RIX-TG

Internet á Íslandi hf · 107
Sovereign (outside US CLOUD Act)5 networks present
on quote

Reykjavik DC

Opin Kerfi hf. · 112
Sovereign (outside US CLOUD Act)3 networks present
on quote

RIX-MH

Internet á Íslandi hf · 108
Sovereign (outside US CLOUD Act)3 networks present
on quote

Ármúli 25

Mila hf. · 108
Sovereign (outside US CLOUD Act)4 networks present
on quote

SDC Capital

Stormur Datacenters ehf. · 107
Sovereign (outside US CLOUD Act)2 networks present
on quote

Borealis Data Center

Borealis Data Center · 108
Sovereign (outside US CLOUD Act)
on quote

Reykjavík Campus

Borealis Data Center · 112
Sovereign (outside US CLOUD Act)
on quote

What Reykjavik allows

Reykjavik has 9 data centers, operated by DataCell, Internet á Íslandi hf, Opin Kerfi hf., Mila hf..

Connectivity from Reykjavik

8 networks are listed at the sites in Reykjavik according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Cloudflare: they are present at the exchange point where 3 of the 9 sites in the city are points of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Reykjavik

A city has no electricity of its own: the sites in Reykjavik are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 70.7% of its electricity from hydro (2024). The detail: hydro 70.7%, geothermal and other renewables 29.2%. Fossil fuels (coal, gas, oil) account for 0% of it. A kilowatt-hour there weighs 28 g of CO2, i.e. 16.4 times less than the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1 tonne of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Reykjavik

Since 1970, 28 earthquakes of magnitude 5 or above have been recorded within 100 km of Reykjavik, and 38 within 200 km. The strongest: magnitude 6.5 in 2000, 57 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Reykjavik does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Reykjavik

The nearest site outside Reykjavik is 12 km away, in Hafnarfjörður. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.