Jawa Barat has 1 data center listed on DataColoc, operated notably by BDx DC Services Limited. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.
Colocation in Jawa Barat (server housing) relies on one listed data center, operated by BDx DC Services Limited. Your servers are hosted in a 19" rack featuring redundant power, cooling, and 24/7 security. Its top-connected site lists 6 networks. For a wider choice, nearby cities and their distances are listed below.
DataColoc lists 1 data center offering colocation in Jawa Barat (BDx DC Services Limited). The nearest alternatives are listed below, with their distance.
The site lists up to 6 networks. IP transit and cross-connects can be estimated based on your needs using the comparison tool.
No certification is declared yet; filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to widen to compliant nearby cities.
Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.
Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.
Compare data centers in Jawa Barat →The data center listed in Jawa Barat is operated by BDx DC Services Limited.
6 networks are listed at the sites in Jawa Barat according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.
A city has no electricity of its own: the sites in Jawa Barat are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.5% of its electricity from coal (2024). The detail: coal 61.5%, natural gas 18.5%, hydro 7.3%, bioenergy 5.7%, geothermal and other renewables 4.5%, oil (fuel oil, diesel) 1.9%. Fossil fuels (coal, gas, oil) account for 81.9% of it. A kilowatt-hour there weighs 680 g of CO2, i.e. 1.5 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 24.1 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.
Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.
Since 1970, 79 earthquakes of magnitude 5 or above have been recorded within 100 km of Jawa Barat, and 306 within 200 km. The strongest: magnitude 7.5 in 2007, 118 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.
Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.
With a single listed site, Jawa Barat cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.
The nearest site outside Jawa Barat is 13 km away, in Kota Bogor. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.