Compare & price
HomeData centersIndonesiaCimanggis

Data centers in Cimanggis

Cimanggis has 1 data center listed on DataColoc, operated notably by Biznet Technovillage. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Compare data centers in Cimanggis →

Biznet Technovillage

Biznet Technovillage ยท 16995
11 networks present
on quote

What Cimanggis allows

The data center listed in Cimanggis is operated by Biznet Technovillage.

Connectivity from Cimanggis

11 networks are listed at the sites in Cimanggis according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Meta, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Cimanggis

A city has no electricity of its own: the sites in Cimanggis are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.5% of its electricity from coal (2024). The detail: coal 61.5%, natural gas 18.5%, hydro 7.3%, bioenergy 5.7%, geothermal and other renewables 4.5%, oil (fuel oil, diesel) 1.9%. Fossil fuels (coal, gas, oil) account for 81.9% of it. A kilowatt-hour there weighs 680 g of CO2, i.e. 1.5 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 24.1 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Cimanggis

Since 1970, 65 earthquakes of magnitude 5 or above have been recorded within 100 km of Cimanggis, and 292 within 200 km. The strongest: magnitude 7.5 in 2007, 101 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the site's coordinates.

What Cimanggis does not allow

With a single listed site, Cimanggis cannot support a disaster-recovery plan spread over two separate buildings within the same town. A second site remains necessary, and it is found in the nearby cities listed below. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Cimanggis

The nearest site outside Cimanggis is 7 km away, in Bogor (5 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Indonesia