Compare & price
HomeData centersIndonesiaBekasi

Data centers in Bekasi

Bekasi has 6 data centers listed on DataColoc, operated notably by ST Telemedia Global Data Centres (STT GDC), PT XLSmart Telecom Sejahtera Tbk, Graha Teknologi Nusantara, PT. Mettadc Teknologi Indonesia, DCI Indonesia, PT. Infotama Lintas Global. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Bekasi (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 6 data centers offering colocation in Bekasi, including ST Telemedia Global Data Centres (STT GDC), PT XLSmart Telecom Sejahtera Tbk, Graha Teknologi Nusantara, PT. Mettadc Teknologi Indonesia.

Frequently asked questions

How much does a rack (colocation) cost in Bekasi?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 6 data centers in Bekasi to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Bekasi are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Bekasi really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Bekasi, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€688 – €823
Cost per kW per month€121 – €144
Over 3 years (36 months)€24,768 – €29,628

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a IDR conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Bekasi →

STT Jakarta 1

ST Telemedia Global Data Centres (STT GDC) · 17530
2 networks present
on quote

XLSmart Cibitung (JNB2)

PT XLSmart Telecom Sejahtera Tbk · 17530
4 networks present
on quote

Graha Teknologi Bekasi

Graha Teknologi Nusantara · 17530
2 networks present
on quote

MettaDC ID01

PT. Mettadc Teknologi Indonesia · 17530
8 networks present
on quote

DCI Indonesia (JK6)

DCI Indonesia · 17520
3 networks present
on quote

INFOTAMA HEXA BUILDING

PT. Infotama Lintas Global · 17510
1 networks present
on quote

What Bekasi allows

Bekasi has 6 data centers, operated by ST Telemedia Global Data Centres (STT GDC), PT XLSmart Telecom Sejahtera Tbk, Graha Teknologi Nusantara, PT. Mettadc Teknologi Indonesia.

Connectivity from Bekasi

8 networks are listed at the sites in Bekasi according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Alibaba Cloud, Amazon Web Services, Tencent Cloud, Meta, Akamai, Cloudflare: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

The electricity behind Bekasi

A city has no electricity of its own: the sites in Bekasi are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 61.5% of its electricity from coal (2024). The detail: coal 61.5%, natural gas 18.5%, hydro 7.3%, bioenergy 5.7%, geothermal and other renewables 4.5%, oil (fuel oil, diesel) 1.9%. Fossil fuels (coal, gas, oil) account for 81.9% of it. A kilowatt-hour there weighs 680 g of CO2, i.e. 1.5 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 24.1 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Bekasi

Since 1970, 34 earthquakes of magnitude 5 or above have been recorded within 100 km of Bekasi, and 245 within 200 km. The strongest: magnitude 7.5 in 2007, 57 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Bekasi does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Bekasi

The nearest site outside Bekasi is 4 km away, in Jakarta, Cibitung (2 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Indonesia

Advertisement