Data centers in Libreville

Libreville has 4 data centers listed on DataColoc, operated notably by Airtel Gabon S.A, Gabon Internet eXchange (GABIX), ST Digital. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Libreville (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Libreville, including Airtel Gabon S.A, Gabon Internet eXchange (GABIX), ST Digital.

Frequently asked questions

How much does a rack (colocation) cost in Libreville?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Libreville to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Libreville are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Libreville really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Libreville, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€928 – €1,136
Cost per kW per month€164 – €203
Over 3 years (36 months)€33,408 – €40,896

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Libreville →

Airtel Gabon

Airtel Gabon S.A · 9259
1 networks present
on quote

GABIX POP ACE

Gabon Internet eXchange (GABIX) · 13831
4 networks present
on quote

GABIX POP CT-1

Gabon Internet eXchange (GABIX) · 13831
5 networks present
on quote

Datacenter Services Libreville

ST Digital · 0000
1 networks present
on quote

What Libreville allows

Libreville has 4 data centers, operated by Airtel Gabon S.A, Gabon Internet eXchange (GABIX), ST Digital.

Connectivity from Libreville

5 networks are listed at the sites in Libreville according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

The electricity behind Libreville

A city has no electricity of its own: the sites in Libreville are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 44.2% (2024). The detail: natural gas 44.2%, hydro 35%, oil (fuel oil, diesel) 20.4%. Fossil fuels (coal, gas, oil) account for 64.6% of it. A kilowatt-hour there weighs 523 g of CO2, i.e. 1.1 times the world average (458 g), 2024 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 18.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Libreville

Since 1970, 0 earthquake of magnitude 5 or above has been recorded within 100 km of Libreville, and 3 within 200 km. The strongest: magnitude 5.5 in 2022, 180 km away. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Libreville does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.