Compare & price
HomeData centersFranceMontpellier

Data centers in Montpellier

Montpellier has 4 data centers listed on DataColoc, operated notably by UltraEdge, Etix Everywhere, Montpellier Internet Telecom Datacenter. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Montpellier (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 4 data centers offering colocation in Montpellier, including UltraEdge, Etix Everywhere, Montpellier Internet Telecom Datacenter.

Frequently asked questions

How much does a rack (colocation) cost in Montpellier?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 4 data centers in Montpellier to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Montpellier are ISO 27001 certified?

2 of the 4 data centers listed in Montpellier declare ISO 27001. Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Montpellier really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Montpellier, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€835 – €963
Cost per kW per month€145 – €168
Over 3 years (36 months)€30,060 – €34,668

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Montpellier →

UltraEdge Montpellier

UltraEdge · 34070
Sovereign (outside US CLOUD Act)Cert.: ISO 27001, ISO 50001, HDS5 networks present
on quote

ETIX Montpellier #1

Etix Everywhere · 34000
Sovereign (outside US CLOUD Act)Cert.: ISO 27001, ISO 50001, HDS, PCI DSS13 networks present
on quote

Cogent Montpellier

· 34070
Sovereign (outside US CLOUD Act)16 networks present
on quote

Montpellier Internet Telecom Datacenter

Montpellier Internet Telecom Datacenter · Herault
Sovereign (outside US CLOUD Act)2 networks present
on quote

What Montpellier allows

Montpellier has 4 data centers, operated by UltraEdge, Etix Everywhere, Montpellier Internet Telecom Datacenter.

Connectivity from Montpellier

16 networks are listed at the sites in Montpellier according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 2 Internet exchange points are reachable from these sites, which cuts latency to the large content networks and the cost of transit. The large networks reachable directly from these sites, without buying transit, are Hetzner, OVHcloud, Scaleway: they are present at the exchange point where one site in the city is a point of presence. Reaching your cloud over an exchange point rather than the public Internet changes latency, and above all the price of data egress.

Compliance and sovereignty

Declared certifications: ISO 27001, ISO 50001, HDS, PCI DSS. A certification is verified site by site and carries an expiry date: ask for the certificate, not the logo. Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Montpellier

A city has no electricity of its own: the sites in Montpellier are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. That grid draws 68.8% of its electricity from nuclear (2025). The detail: nuclear 68.8%, hydro 10.4%, wind 8.2%, solar 5.6%, natural gas 3%, oil (fuel oil, diesel) 1.8%. Fossil fuels (coal, gas, oil) account for 5.1% of it. A kilowatt-hour there weighs 41 g of CO2, i.e. 11.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 1.5 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Montpellier

No earthquake of magnitude 5 or above has been recorded within 200 km of Montpellier since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Montpellier does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Montpellier

The nearest site outside Montpellier is 10 km away, in Saint Aunes. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in France

Advertisement