Compare & price
HomeData centersFinlandJyväskylä

Data centers in Jyväskylä

Jyväskylä has 2 data centers listed on DataColoc, operated notably by TNNet Oy, Konesali Yhtio Jyvaskyla Oy. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Jyväskylä (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 2 data centers offering colocation in Jyväskylä, including TNNet Oy, Konesali Yhtio Jyvaskyla Oy.

Frequently asked questions

How much does a rack (colocation) cost in Jyväskylä?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 2 data centers in Jyväskylä to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Jyväskylä are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Jyväskylä really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Jyväskylä, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€863 – €1,071
Cost per kW per month€152 – €191
Over 3 years (36 months)€31,068 – €38,556

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Jyväskylä →

Datavault Kanavuori inc.

TNNet Oy · 40800
Sovereign (outside US CLOUD Act)1 networks present
on quote

Konesali Yhtiöt Jyväskylä

Konesali Yhtio Jyvaskyla Oy · 40100
Sovereign (outside US CLOUD Act)1 networks present
on quote

What Jyväskylä allows

Jyväskylä has 2 data centers, operated by TNNet Oy, Konesali Yhtio Jyvaskyla Oy.

Connectivity from Jyväskylä

1 network is listed at the sites in Jyväskylä according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works.

Compliance and sovereignty

Sites in this city are operated by companies outside US jurisdiction, hence outside the CLOUD Act.

The electricity behind Jyväskylä

A city has no electricity of its own: the sites in Jyväskylä are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, nuclear, supplies only 39.9% (2025). The detail: nuclear 39.9%, wind 27.4%, hydro 15.1%, bioenergy 12.6%, oil (fuel oil, diesel) 2.3%, natural gas 1.2%. Fossil fuels (coal, gas, oil) account for 3.7% of it. A kilowatt-hour there weighs 57 g of CO2, i.e. 8 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 2 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Jyväskylä

No earthquake of magnitude 5 or above has been recorded within 200 km of Jyväskylä since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Jyväskylä does not allow

No Internet exchange point is listed here: traffic will run over transit bought from a carrier, which is billed by bandwidth. No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Jyväskylä

The nearest site outside Jyväskylä is 136 km away, in Tampere (4 sites). Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in Finland

Advertisement