Compare & price
HomeData centersUnited StatesMilwaukee

Data centers in Milwaukee

Milwaukee has 5 data centers listed on DataColoc, operated notably by Wells Interconnection, Vaultas, Inc., TSR Solutions, Inc., TierPoint, LLC, Stack41, LLC. Compare colocation (rack, half-rack, 1U), pricing, certifications and connectivity, then get an instant costed estimate.

Server colocation in Milwaukee (server housing) means installing your own servers in a rack or cabinet (42U) inside a secure data center: redundant power, cooling, 24/7 security and multi-carrier connectivity. DataColoc lists 5 data centers offering colocation in Milwaukee, including Wells Interconnection, Vaultas, Inc., TSR Solutions, Inc., TierPoint, LLC.

Frequently asked questions

How much does a rack (colocation) cost in Milwaukee?

a full rack is priced on electrical power (kVA), IP transit and cross-connects. Compare the 5 data centers in Milwaukee to get a costed quote.

What is the difference between housing and colocation?

None: “housing” and “colocation” mean the same thing — hosting your own servers in a third-party data center, as opposed to renting a dedicated server or public cloud.

Which data centers in Milwaukee are ISO 27001 certified?

Filter by certification (ISO 27001, HDS, PCI-DSS) in the comparator to keep only compliant sites.

Learn the basics: colocation, 42U rack, cross-connect, IP transit, Tier III/IV.

Costed answers: how much does a rack cost?, cross-connect pricing, colocation or cloud? — and the colocation price barometer.

What does a rack in Milwaukee really cost?

Beyond listed prices, here is the computed cost of a standard 5 kW rack in Milwaukee, from our open market model (published method, version 2026.07-v1):

ItemEstimate
5 kW rack, per month€661 – €837
Cost per kW per month€122 – €147
Over 3 years (36 months)€23,796 – €30,132

Amounts are in euros: the model is computed in EUR, including for markets outside the euro area. We do not show a USD conversion until a dated, sourced rate backs it.

What this covers: local industrial energy tariff, site efficiency (PUE), retail colocation margin and local market tightness. What it does not: IP transit, cross-connects, setup fees and PDUs — priced site by site in the comparator.

An estimate, not an offer. It is a model, with an open method and a version — not a contractual rate. A quote prices your actual configuration. Think the model is wrong? The method is published: tell us where.

Compare data centers in Milwaukee →

324 E Wisconsin

Wells Interconnection · 53202
7 networks present
on quote

Vaultas

Vaultas, Inc. · 53202
on quote

TSR Solutions Data Center

TSR Solutions, Inc. · 53202
5 networks present
on quote

TierPoint Milwaukee

TierPoint, LLC · 53215
1 networks present
on quote

Data Holdings Milwaukee

Stack41, LLC · 53208
2 networks present
on quote

What Milwaukee allows

Milwaukee has 5 data centers, operated by Wells Interconnection, Vaultas, Inc., TSR Solutions, Inc., TierPoint, LLC.

Connectivity from Milwaukee

7 networks are listed at the sites in Milwaukee according to public interconnection registries. That number drives your negotiating power: every carrier inside the building is one more quote, with no civil works. 1 Internet exchange point is reachable from these sites, which cuts latency to the large content networks and the cost of transit.

Compliance and sovereignty

Note: part of the operation falls under a US-jurisdiction company, hence under the CLOUD Act. Hosting in Europe is not enough to escape it: what counts is the provider's nationality, not the building's address.

The electricity behind Milwaukee

A city has no electricity of its own: the sites in Milwaukee are connected to the national grid, itself interconnected with its neighbours. What is measured, and what decides, is therefore the country's generation mix. No single source dominates it: the largest, natural gas, supplies only 40% (2025). The detail: natural gas 40%, nuclear 17.4%, coal 16.3%, wind 10.3%, solar 8.6%, hydro 5.3%. Fossil fuels (coal, gas, oil) account for 57% of it. A kilowatt-hour there weighs 384 g of CO2, i.e. 1.2 times less than the world average (458 g), 2025 figure. Concretely: a 3 kVA rack, in a site with a PUE of 1.5, draws 35,478 kWh a year and therefore emits 13.6 tonnes of CO2 a year here. The same rack, same hardware, same PUE, would emit 16 tonnes on a world-average grid. The building has nothing to do with it: the country does.

Source: Ember / Energy Institute via Our World in Data, retrieved 2026-09-14. A site under a direct renewable purchase agreement may show a different balance: that is for the operator to declare.

What the ground has done under Milwaukee

No earthquake of magnitude 5 or above has been recorded within 200 km of Milwaukee since 1970, according to the US Geological Survey's global catalog. This record covers 56 years, which is short on a seismic timescale: no recorded earthquake does not mean no hazard. It does not replace the statutory zoning, which alone binds construction.

Source: U.S. Geological Survey, ANSS ComCat, retrieved 2026-09-14. Measured from the median coordinates of the city's sites.

What Milwaukee does not allow

No rate is published by the operators in this city: pricing is on request, and we do not estimate it on their behalf.

Other cities with data centers near Milwaukee

The nearest site outside Milwaukee is 28 km away, in Germantown. Short distances matter: they drive the cost of a link between two buildings, and whether a backup site is workable.

← All data centers in United States

Advertisement